Project Title Period Client Description
Gulf Energy - Ukunda Petrol Station September 2014 -October 2014 Gulf Energy- Nairobi Head Office Supply and Installation for Two units electrical materials, meters and handling the canopy lights together with the MID (Ksh. 137,000)
3 classes Electrical Wiring - Mazeras November 2013 Mazeras Girls Memorial Secondary school, P.O Box 86 - 80144 Mazeras Supply of electrical materials, wiring Installation, testing and commissioning of lighting fixtures and socket outlets for their three class rooms (ksh. 101,920)
Jamvi La Wageni hse - Likoni March 2012 Asmaa Hassan S. Supply of electrical materials, wiring Installation, testing and commissioning of lighting fixtures and socket outlets for the entire house (ksh 56,400)
Electrical Installation - Mombasa Railway Clinic July 2012 Mombasa Railway Clinic, P.O Box 40195 - 00100 Supply of electrical materials, wiring Installation, testing and commissioning of lighting fixtures and socket outlets for the entire clinic (ksh. 47,940)
Electrical Installation - Likoni Maweni hse March 2013 Ali Hassan Jumbe Supply of electrical materials, wiring Installation, testing and commissioning of lighting fixtures and socket outlets for the entire house (ksh. 37,945)
Change 65 Post Paid Meters to Prepaid - Ganjoni Madrasatul Muadh al islamiyya - Mombasa Changing KPLC Post Paid Meters to Prepaid Meters - a total of 65 meters were installed for the entire building
Change 6 Post Paid Meters to Prepaid - Bamburi - plot 328/11/MN Maulid Sadiq Changing KPLC Post Paid Meters to Prepaid Meters - a total of 6 meters were installed for the entire building
Tudor Polytechnic hse May 2013 Ali Ahmed Ali Pump installation for his bore hole complete with its floater switch and bore hole water level sensor, Supply of electrical materials, wiring Installation, testing and commissioning of lighting fixtures and socket outlets for the entire house (247,595)
Serani Secondary School Serani Secondary School Supply of electrical materials, wiring Installation, testing and commissioning of lighting fixtures and socket outlets for their new laboratory (123,630)